2006 FACILITY OF THE YEAR FINALISTS
Download the 2006 Facility of the Year Award Winner Powerpoint Presentation (38 MB)
![]() |
2006 Facility of the Year Award Winner! Baxter BioPharma Solutions Project: Phase IV Expansion
Project Information: The Bloomington facility’s Phase IV expansion is designed to provide the benefit of faster turn-around time and cost savings with large-scale syringe filling, aseptic formulation, vial filling, lyophilization, terminal sterilization, and flexible formulation capacity for a variety of challenging products such as insoluble solutions and vaccines. Product: Pre-filled syringes and lyophilized vials Key Project Participants:
Timeline:
|
![]() |
AstraZeneca Project: Large Scale Laboratory (LSL) Project Information: The LSL has been a highly successful venture between AstraZeneca and its Alliance Partners to deliver a state-of-the-art facility enabling Campaign 2 (C2) manufacture of drug substance for volunteer studies to be taken off the critical path. Product: Volunteer study pharmaceuticals for gastrointestinal, cardiovascular, respiratory, oncology and neuroscience disorders Key Project Participants:
Timeline:
|
![]() |
Daiichi Asubio Pharma Co., Ltd Project: New Bio Plant (NBP)
Project Information: ASUBIO's New Bio Plant is a multi-product and multi-scale "Launch Plant" for bio bulk products adopting unique processes, making it a first in Japan. As a launch plant, new drugs will be distributed to consumers directly from the plant. Products: Biological Bulk products – API of peptide for clinical and commercial use Key Project Participants:
Timeline:
|
![]() |
Janssen Pharmaceutica Project: Small Volume Area – Powder Unit
Project Information: The facility is for handling highly potent powders and is one of four separate state-of-the-art production installations comprising the High Containment Production Chain. Consistent with the so-called containment technology, these installations are fully enclosed and, as a result, substantially enhance quality and safety. The facility combines state-of-the-art milling installation and high-technology separation with the aid of glove boxes, or isolators. Products: Fentanyl, buprenorphine, itraconazole, haloperidol Key Project Participants:
Timeline:
|
![]() ![]() |
Wyeth Pharmaceuticals Project: The Wyeth BioPharma Campus at Grange Castle Project Information: This new facility was developed to meet the demand for Enbrel and Prevenar and provides strategic manufacturing capacity for all other biological projects. The result is the largest fully integrated facility ever built in single phase. The facility was designed to meet current needs and future capabilities and is capable of manufacturing bulk drug substance and fill-finishing biologics, vaccines, and antibiotics on one campus. Products: Enbrel, Prevnar, Tygacil Key Project Participants:
Timeline:
|
![]() ![]() |
Special Merit Recognition: Biolex Therapeutics Project: Phase II Manufacturing Expansion
Project Information: By emphasizing project simplicity, the GMP facility was completed from the beginning of design through IQ/OQ validation in only five months. Additionally, the project was delivered under budget, with no safety incidents, and with superior quality. Products: Alpha Interferon Key Project Participants:
Timeline:
|









